You have two options here you can make your own or you may be able to find acceptable prefabricated third party starter strips available for purchase.
How to start installation of hardie siding.
Measure and cut 32 inches off the first piece of the third row saving the cut pieces to use on the other end of the.
Due to overlapping of the joints caulk is not required except where panels abut trim boards.
Hardie plank siding is almost always installed with air nailers which are the best tool for quick installation.
After removal of the old siding new house wrap should be installed to provide a water barrier between the.
Ensure keyways do not line up on subsequent courses.
Install a 32 inch panel on the second row using the cut end to abut the trim.
You can make your own fiber cement starter strip by ripping a piece of hardieplank lap siding into 1 1 4 inch strips.
How to install hardie board lap siding preparation.
In this video i show how i installed fiber cement siding to finish the exterior walls of the new room.
Install a 16 inch panel on the.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
Install hardieshingle panels with joints butted in moderate contact.
Installing hardiplank lap siding.
1 install a 1 1 4 in starter strip then install a 8 1 4 in wide hardieplank lap siding starter course.
The only downside of pneumatic tools is that sometimes the installer will get going a little bit too quickly and will lose track of where the nails are going.
Blind nail your hardie siding in place.
Begin at the lowest point at the side of your house where you will install your hardie siding.
Measure and cut 16 inches off the first piece of the second row.