X research source nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.
Lap siding is installed upward starting at the bottom of the wall.
If there are any windows or doors nail j channel around the edges of those as well.
If you are planning to paint your siding it s a good idea to prime all the pieces on all sides before installing them.
When installing vinyl siding on each side of a window or door start on the side that needs the longer panels.
At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
Start with a level chalk line for the bottom starter strip and check the level periodically as you go up.
For vertical siding install j channel trim.
The nails holding one board are covered by the next one.
We cover how to move doors and windows and create a weather proof exterior.
Longer siding panels don t stretch as readily as smaller ones so they re not as easy to adjust if they get out of whack.
That way the backsides will also be protected against rot and the boards are less likely to cup or.
If the top is mitered miter the sides as well.
To install vertical metal siding start by applying horizontal furring strips and sheathing to the surface you re working on if it s uneven.
Siding pieces snap together starting with a metal bottom strip and are nailed in place through slots at the top of the siding pieces nails should be placed in the center of those slots to allow for expansion and contraction.
For horizontal siding install f channel trim at the soffit and gable rake.
Install trim under eaves rakes.
Nail every 12 inches on center.
Not just another vinyl siding installation video.
Then install the corner posts that came with your siding and nail j channel along the top and bottom of the wall.