Roof construction standard traditionalroof framing is sufficient to handle the weight of standard thickness slates which are 3 16 to 1 4 inch thick.
Installation slate roof construction detail.
3 before you start do your homework.
Slates should overlap by at least three inches on the sides called sidelap.
Furring strips were nailed to roof with 2 5 inch hot dipped galvanized common nails.
Understand headlap read about the common mistakes people make when installing slate roofs.
Then now is the perfect time to install a new slate roof.
Architectural drawings accurately illustrate flashing and roof lay out.
Read about how to install starter courses take a look at common contractor errors watch some video clips read about drip edges and cant strips if necessary look at some of the nuances that may be pertinent to your installation such as cleats on aprons cleats on.
2 finish slating as close to timber roll as possible.
The wood strips should be approximately 3 times the thickness of the slates.
The slate nearest the hip slate must remain a full slate.
All new nsa members receive one free copy of the award winning.
Here are some of the things that are covered in more detail roof pitch the angle of a roof not only determines what slates to use but the amount of overlap that the slate roof needs to remain waterproof.
If your roof is steep with a pitch of.
Alternate solutions to slate roofing problems are provided.
Take a look at the slate tile roof installation guide to gather more detailed information regarding the repair installation of slate roofs.
At cmr construction roofing we help home and business owners find ways to improve the safety beauty and dependability of their roofing system.
Let s start with roof construction.
Install first piece of copper flashing over bottom of furring strips.
How to install a slate roof the details.
3 cover the timber roll with code 6 lead strips 450 to 500 mm wide and 1 5 to 1 8 m long.
Architects consultants slate installers and designers rave about this book.
Ihave seen 130 year old slate roofs in.
Fixing sequence with lead roll hip 1 fix 600 mm wide underlay overlapping the main underlay.
This is 20 ounce copper.
Even more important is the overlap at the top of each slate called headlap.