Step 6 install the flashing.
Installing metal roof valley flashing.
Cut the bottom edge and fold it down over the drip edge.
Remember to caulk the underside of the flashing with a sealant.
Then install a non corrosive metal valley flashing of 24 minimum width lap successive sheets of metal flashing a minimum of 12 inches and seal laps.
Make sure to cover the gap at the bottom of the raised ridge.
Use 1 inch galvanized roofing nails.
Drip edge metal valley flashing dormer chimney and kick out flashing shed water away from the connections between roofs walls chimneys and other building assemblies this collection of 18 articles animations and videos identifies the critical roof flashing areas illustrates durable roof flashing details and shows how to flash roofs.
Apply an approximately 3 inch.
Fold the top of the flashing over the ridge.
Install an underlayment centered in the roof valley.
Others start with a 3 inch wide.
Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present.
Place the flashing on the upper portion or the upper flange of the batten.
Snipping off the corners of.
How to do it determine cuts.
Lay the flashing down in the roof valley and start at the lower end of the roof.
A batten is a roofing component made of a thin layer of metal plastic or wood and is used as a fixing point for roof tiles and roofing sheets.
Place a piece of sheet metal under the shingles to make sure you will not damage the flashing.
To splice the pieces add roofing cement to the lower piece and install the upper piece with at least a six inch.
Lay the flashing in a way that.
Some roofers cut the shingles parallel to the flashing s center ridge.
Make sure that the end of the flashing panel is perfectly in line with the edge of the roof.
Recommended procedures of basic valley flashing installation.