It was actually kind of a random thing.
Installing shower stall door.
In this video i show installing a frameless shower door enclosure.
Drill proper holes into the walls for the side rails.
Place end caps on the tops of the wall channels.
Put it in place and tape it down until the side rails are in place image 2.
How to install a shower door shower door overview.
How to install a basic sliding tub shower door.
Measure the length of the shower threshold then use a hacksaw to cut the aluminum base.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
Install the handles and the rubber stoppers image 2.
If water is escaping between the door and base track consider attaching a separate drip tray to catch and redirect what.
Click enlarge this image to.
This will be secured by a metal threshold that fits onto the front lip of the tub two side columns that will be secured into the tile walls and a single cross member to connect the columns on top.
Set the base track.
The interior door goes in first and then the exterior door is installed from the bottom up.
Attach the door handles and any towel bars.
Cut the base track to length.
How to install a basic sliding tub shower door.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
You install the bottom track on the top edge of the shower base or tub.
The top and bottom tracks supplied by the manufacturer must be cut slightly shorter.
How to install a frameless shower door.
Locating the bottom track.
Locating the wall.
Run a bead of silicone on the underside of the threshold piece image 1.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Shower door kits will come with a set of metal tracks that seat the shower door so most of the assembly process involves installing the metal frame.
Attach the seal strip to the bottom of the door and cut it to the required length.
Towel off the wet frame before adding more sealant and allow the sealant to cure completely prior to your next test.